Caledonia Gas Storage
- Type of facility: Depleted natural gas reservoir
- Location: Lowndes County, Mississippi
- Working gas capacity: 13.2 Bcf
- Peak injection capability: 375 MMBtu/day
- Peak withdrawal capability: 475 MMBtu/day
- Owner: ENSTOR
- Operator/ Manager: ENSTOR
The Caledonia storage facility is a high-deliverability, multi-cycle gas storage facility in Lowndes County, Mississippi.
Caledonia interconnects with Tennessee Gas Pipeline 500 Leg, in Zone 1 in an area traversed by numerous interstate pipelines which access the prolific Barnett, Woodford and Haynesville shale production areas. Additionally, this pipeline serves the growing natural gas demand markets in the Northeast, Southeast and Ohio Valley regions of the U.S.
This provides excellent access to multiple electric power and natural gas markets, giving customers access to firm and interruptible storage opportunities.
To inquire about firm storage or to request additional information, contact:
Kay Atchison
Director, Marketing
(281) 374-3075
Tom Van Matre
Hub Services Manager
(281) 374-3054
Cory Crofton
Long-Term Hub Services Manager
(281) 374-3066
Matt Singer
Hub Services Analyst
Scheduling and Nominations
(281) 374-3082

